Mobile07470 078236 Request a Quote
Finished single-storey rear extension in Bognor Regis: red brick with a soldier course, anthracite bifold doors, a matching back door and a flat roof

House Extensions in Bognor Regis and West Sussex

Single-storey rear, side-return, wrap-around and two-storey extensions, built by a local firm that has been building in West Sussex since 2008. Work out a guide price below, then let James come and look.

50m² rear extension, Victoria Road, Bognor Regis — finished October 2026
  • Rated 5 stars on Yell
  • Building in West Sussex since 2008
  • Fully insured — £2m public liability
  • Free site visit
  • 24-month workmanship guarantee

Extension builders on the West Sussex coast

Swanbourne Extensions is the house extension side of Swanbourne Construction Ltd, working from Unit 27 at Middleton Business Park on the edge of Bognor Regis. We build extensions for homeowners in Bognor, Felpham, Aldwick, Pagham and Middleton-on-Sea, and out to Chichester, Arundel, Littlehampton and Rustington.

What you get is one person in charge from the first visit to the handover, a written quotation that runs to more than two hundred priced lines, and a price you can check against the figures published on this page. If you already have drawings, send them and an itemised quotation comes back. If you only have an idea, James comes out, measures up and tells you honestly what is possible and roughly what it will cost.

  • 100+projects completed
  • 2008building in West Sussex since
  • £2mpublic liability, plus employers' liability
  • 24months' workmanship guarantee

The extensions we build

Every extension is built from your architect’s drawings: foundations, drainage, brick and block, steel, roof, glazing, insulation, screed, plastering, first and second fix, and the finish you choose. These are the four kinds we are asked for most.

Most common

Single-storey rear extension

Out from the back of the house, usually to make one bigger open-plan living and dining space with doors onto the garden. Often possible without a planning application. Our published rate for this is £2,400 to £3,600 per m² including VAT.

Narrow plots

Side and side-return extension

Fills the strip down the side of the house, or the gap beside a back addition on a terrace. Small in area but often the biggest change to how a ground floor feels, because it widens the room rather than lengthening it.

Priced from drawings

Wrap-around extension

A side and a rear extension built as one L-shape. More steel, a more involved roof junction, and usually a planning application, so we price these from the drawings rather than from a rate.

Priced from drawings

Two-storey extension

New space downstairs and a new room upstairs in one build. The rules on distance to the boundary are tighter, and the upstairs ties into the existing roof, so again the price comes from the drawings.

Most extensions also open up into the existing house. A door-width opening and a full-width opening with a steel beam across the back of the house are very different jobs, and the calculator below treats them that way.

Finished single-storey rear extension in buff brick matched to the house, with white sliding doors onto the lawn
A single-storey rear extension, the brick matched to the house and the gutter line carried through.
Three-quarter view of a finished red brick rear extension in Bognor Regis with anthracite bifold doors and wall lights
Victoria Road, Bognor Regis: about 50m², bifold doors and a flat roof with two lanterns.

Extension price calculator

Pick the size and the main choices and you get a guide range, worked out from the same figures as our published price guide. It moves as you change things, so you can see what the glazing, the roof or the opening into the house does to the money.

Width × depth of the new room, measured inside. A 5m × 6m extension is 30m².
Or work it out:
How many storeys?
How much of the existing back wall comes out. A bigger opening means a bigger steel.

Guide price, including VAT

£77,500 to £105,500

£2,583 – £3,517 per m²

What makes up the figure

    Book a free site visit with these details

    Not sure of a choice? Leave it on the default and say so in your message. James will go through every option at the site visit.

    What an extension costs, and why

    Most builders will not put a price on a website. We publish ours, because it gives you something to measure every quotation against, including ours. Both figures below include VAT at 20%.

    Published guide prices, revised August 2026. All prices include VAT.
    WorkGuide price
    Rear extension, by floor area£2,400 – £3,600 per m² inc. VAT
    Large single-storey extension£75,600 – £120,000 inc. VAT
    Two-storey and wrap-around extensionsPriced from the drawings

    Victoria Road, Bognor Regis: 50m² for £120,000 = £2,400 per m²

    This is a real job, finished in October 2026, and it is the check on the rate above. That money paid for bifold doors, a new back door and windows, the wall between old and new taken out completely, a tiled floor with underfloor heating underneath, good LED lighting, a separate boiler room built on the side, and a fibreglass roof with two lanterns.

    So a well-specified extension came in at the bottom of our band. The band goes higher because the specification and the site, not the floor area, move the price. Take out the underfloor heating, the lanterns and the fibreglass and the rate falls. Put the same footprint on a sloping garden with poor ground and it rises.

    What pushes an extension up the range

    • Glazing. Bifolds, big sliders and lanterns are a large share of the budget on their own.
    • The opening into the house. A doorway and a full-width opening need very different steels.
    • The steel itself: its span, what it carries, and whether it needs a crane to get it in.
    • Underfloor heating and screed instead of radiators.
    • The ground. Trial holes can show deeper foundations, a drain that needs moving, or a tree that sets the depth.
    • Levels and access. A sloping garden needs steps and retaining. If everything has to be barrowed through a side gate, it takes longer.

    In our price

    • Setting out, digging, foundations, drainage connections and inspection chambers
    • Brick and block to match, steel and lintels
    • The roof structure and covering, windows and outside doors
    • Insulation to current standards, screed, plaster, first and second fix
    • Scaffolding and access equipment, skips and waste
    • Building Control liaison and attendance at every inspection
    • Making good and a final clean

    Not in our price, unless written in

    • Planning and Building Control fees, paid by you to the council
    • The structural engineer’s calculations and any party wall surveyor
    • Fitted units, appliances and anything else you are choosing and buying yourself
    • Floor finishes, where you are choosing them
    • Asbestos removal, a consumer unit upgrade or moving a boiler
    • Garden work beyond making good

    How you pay

    A 5% deposit is the standard. After that, every two weeks we value the work actually done on site and you pay against that valuation. We hold back 5% until practical completion. Changes are priced in writing and agreed before they are done, and you get a couple of days at the end to walk the job and list anything that needs putting right before the final payment.

    Price match guarantee

    Swanbourne price match guarantee badge

    We will never compromise on quality but we will match any like-for-like price.

    The important words are like-for-like. A cheaper extension quote is often a different job on paper: shallower foundations, cheaper glazing behind the same description, no scaffold, or no making good. Bring the other quotation to the site visit and we will go through it line by line against ours. Either we match it, or you find out what it leaves out.

    What extension customers say

    Rated 5 stars on Yell. Copied word for word from our Yell listing, with the name and date Yell shows.

    Couldn’t Fault the Experience

    Had a rear extension done and honestly couldn’t fault the experience. From the first chat through to the final finish, everything was well organised and the quality of work is spot on.

    JamesH-5873 · Yell · 30 Sept 2026

    Professional Extension Project

    We had a fairly large rear extension built and the whole project was managed professionally from start to finish. Swanbourne Construction kept everything running smoothly.

    MichaelO-752 · Yell · 30 Sept 2026

    Fantastic Single-Storey Extension

    We chose Swanbourne Construction for a single-storey extension and we’re so glad we did. The build was well managed, tidy, and the end result looks fantastic.

    HelenC-2454 · Yell · 30 Sept 2026

    Excellent Home Extension

    We hired them for a home extension and couldn’t be happier with the result. The build quality is excellent and the whole process felt well organised.

    DanielP-993 · Yell · 30 Sept 2026

    Highly Recommended!

    Swanbourne Construction built a rear extension for us in 2025 at our West Sussex property. James coordinated everything well and the finished space has completely changed how we use our home.

    LucyR-472 · Yell · 06 Feb 2026

    See all our reviews on Yell

    How an extension job runs

    The order matters as much as the work. This is how we run every extension, from the first visit to the certificate.

    1. Free site visitJames looks at the boundaries, the levels, where the drains and manholes run, and the existing roof.
    2. The planning routePermitted development, prior approval or a planning application, decided before anything is drawn.
    3. Drawings and structural designFrom your architect and engineer. We work from their drawings rather than designing it ourselves.
    4. Trial holesDug before the price is fixed, so the foundations are priced on what is actually under your lawn.
    5. Itemised quotationTwo hundred plus lines on a job of this size, with the assumptions written out, plus the safety paperwork and method statements.
    6. NoticesThe party wall notice goes out in your name with our help, and the Building Control application is made.
    7. Foundations, walls, steel and roofSet out, dig, pour the foundations, then the walls, the steels and the roof go on.
    8. Opening up, late on purposeThe wall into the house stays closed until the new part is watertight. You keep a sealed house for most of the job.
    9. Fitting outFirst fix, insulation, screed and plaster, then second fix and the finishes you have chosen.
    10. Sign-offThe Building Control final inspection and your completion certificate, with the guarantee paperwork.
    Cavity wall of a rear extension going up off the slab: facing brick outer leaf, insulation boards and grey blockwork inner leaf, with scaffold behind
    Brick outer leaf, insulation and blockwork going up together. The openings are formed as the wall is built, not cut out later.
    Warm flat roof being built over an extension: foil-faced insulation over the deck, timber firrings set to fall and two openings framed for rooflights
    A warm flat roof going on: insulation over the deck, timbers set to fall, two openings framed for rooflights.

    All workmanship is guaranteed for 24 months from completion, and the manufacturers’ warranties on the materials and products we fit are passed to you in full; many run to 10 years or more. Structural work is signed off by Building Control and we carry £2m public liability insurance and employers’ liability. We are working towards an insurance-backed guarantee scheme and will offer it as soon as we are eligible.

    Planning, building regulations and party walls, in plain English

    These are the general rules for houses in England. Your own house may be different: conservation areas, the National Park, an Article 4 direction or a condition on an earlier planning permission can all change the answer, so we check before anything is drawn.

    Do I need planning permission for a single-storey rear extension?

    Often not. Under permitted development a single-storey rear extension can go out up to 3m beyond the original back wall of an attached house, or 4m on a detached house, and be up to 4m high. The materials should look similar to the house, and extensions plus other buildings cannot cover more than half the land around the original house. “Original” means the house as first built, or as it stood on 1 July 1948, so an older extension counts against you. Flats and maisonettes do not have these rights. If you build under permitted development, a Lawful Development Certificate from the council is worth having for when you sell.

    Can I go further than 3m or 4m without a full planning application?

    Usually, yes, through prior approval under the larger home extension scheme: up to 6m on an attached house and 8m on a detached one, still single storey and no more than 4m high. The council writes to your neighbours, who have 21 days to comment, and has 42 days to decide. If it does not decide in time, the work can go ahead. This route is not available in a conservation area or the National Park.

    What about two-storey and side extensions?

    A two-storey rear extension can be permitted development if it goes no more than 3m beyond the original back wall, stays at least 7m from the boundary behind, and has a roof pitch to match the house. A side extension can be permitted development if it is single storey, no more than 4m high and no wider than half the original house. In a conservation area or the National Park, side extensions and two-storey rear extensions need planning permission. A wrap-around, which goes along the side and across the back, usually needs a planning application too.

    Do I need Building Regulations approval?

    Yes. Nearly every extension needs Building Regulations approval, whether or not it needs planning. We deposit the application with Building Control, the inspector visits at set stages (foundations, drains, structure, insulation) and you get a completion certificate at the end. The new walls, floor, roof and glazing have to meet current insulation standards (U-values of 0.18 for walls and floors, 0.15 for the roof and 1.4 for windows).

    Do I need a party wall agreement?

    If you have an attached neighbour, or you are digging foundations within 3m of their house and deeper than theirs, the Party Wall etc. Act 1996 applies. That is separate from planning and Building Control. Work on the party wall itself needs two months’ notice; digging near their foundations needs one month. Your neighbour has 14 days to reply. Many simply agree in writing and it costs nothing. If they dissent or do not reply, surveyors are appointed and the fee is yours as the building owner. We help you serve the notice at the right time.

    Do I need to move out while the extension is built?

    Not usually. The new structure is built and made watertight first, and the wall into the house is opened up near the end. So you live in a sealed house for most of the job, with one short dusty spell rather than a whole winter of it.

    Will the new brickwork match the house?

    We source the closest brick we can and lay a sample panel for you to see before a full order is placed. Permitted development asks for a similar appearance; in a conservation area the planning officer will expect a closer match.

    What happens if the ground turns out to be bad?

    We dig trial holes before the price is firmed up. On this stretch of coast the ground can change a lot from one garden to the next, and a nearby tree can push foundations deeper. Where the ground is not yet known, the quotation carries a provisional sum with the assumed depth written next to it. If the depth changes, you see the revised figure before any concrete goes in.

    About James

    James Reilly, director of Swanbourne Construction Ltd

    James Reilly has been building in West Sussex since 2008 and has more than 100 projects behind him. Swanbourne Construction Ltd was set up in 2025 to put that work under one fully insured limited company, and James is its director.

    There is no salesman and no estimator who passes you on. Ring the number on this page and it is answered in the company’s name, 24 hours a day, by a real person, and passed straight to James, who is the person who will run your job.

    The office and showroom are at Unit 27, Middleton Business Park, Middleton-on-Sea. Visits are by appointment, so ring first and we will make sure someone is there.

    Areas we cover

    We build extensions within about 20 miles of our unit at Middleton-on-Sea, and the price is the same anywhere inside that. Most weeks we are in Bognor Regis and the villages around it; Chichester and Arundel are a short run out, Littlehampton and Rustington along the coast.

    • Bognor Regis
    • Felpham
    • Aldwick
    • Pagham
    • Middleton-on-Sea
    • Chichester
    • Arundel
    • Littlehampton
    • Rustington

    Arun District Council and Chichester District Council are the two planning authorities across this patch, and parts of it fall in conservation areas. If you are just outside the list, ring and ask.

    Book a free site visit

    Tell us about the extension you have in mind. We reply within one working day. If you used the calculator, your choices are already in the message box.

    Free and no obligation. You get a straight answer either way.

    Rough size, what the room is for, and any dates that matter.

    Your details go straight to [email protected] and are only used to reply to you. Prefer to talk? Call 07470 078236 or use WhatsApp.

    Swanbourne Extensions

    07470 078236 01243 256796

    [email protected]
    Message us on WhatsApp

    Unit 27, Middleton Business Park
    Yapton Road, Middleton-on-Sea
    Bognor Regis, West Sussex
    PO22 6HS
    Office and showroom, visits by appointment.
    Monday to Friday
    7am – 10pm
    Saturday
    8am – 9pm
    Sunday
    9am – 6pm

    Phones are answered 24/7 by a member of our team, never a voicemail.

    Request a Quote